Message 2 has two mutually exclusive breakdowns per scheme: per cohort (SPR route) or per investment portfolio (FPR route). The cashflow directly under the scheme, the total, belongs to both routes. Since the final Release 2027 of 12 October 2026, netAmount and netDate are mandatory at every level that carries a cashflow. In addition the chain chooses whether flows are delivered in advance (expected) or afterwards (realised).

Steps

Rules and consistency checks

  • All dates within the reporting period.
  • Reserve contributions and withdrawals at the reserve cohort.
  • In the SPR route the netAmount under the scheme is the sum of the cohorts' netAmount (manual section 6.3.1). Whether the portfolio amounts add up to the total is not laid down in the manual.

Source: Handleiding paragraaf 3.2.2, 3.2.5 en 6.3.1

Attribution. Source: SIVI – VB-PUO Standard. Schemas, attribute descriptions and code lists are taken unchanged from the VB-PUO Standard (owned by the Pensioenfederatie, managed by SIVI) and shown with their release and version. Explanations, examples, error descriptions and translations are by WTP Data Lab and are not part of the standard. GitHub Stichting-SIVI/VBPUOdsk · Manual · sivi.org