The schema accepts the message; the receiver rejects it functionally or books the flows in the wrong period.
Cause
Dates were swapped or the period was not updated after the month change.
Fix
Check before sending that startDate ≤ endDate and that all transaction dates fall within the period; the WTP Data Lab validator performs this consistency check.
Check your own message for this and all other errors with the free validator: schema, code lists and consistency checks in one report.Validate a message
Attribution. Source: SIVI – VB-PUO Standard. Schemas, attribute descriptions and code lists are taken unchanged from the VB-PUO Standard (owned by the Pensioenfederatie, managed by SIVI) and shown with their release and version. Explanations, examples, error descriptions and translations are by WTP Data Lab and are not part of the standard. GitHub Stichting-SIVI/VBPUOdsk · Manual · sivi.org